Latest News

  • Ireland’s warehouses are running out of floor, not height
  • DHL Group continues its growth trajectory in the third quarter and significantly increases revenue and earnings
  • Elevate Storage Solutions wins major S&W Wholesale contract as it continues all-Ireland growth
  • KNAPP UK announces leadership transition
  • Jungheinrich launches sales of the new generation of EFG 5 electric counterbalance forklift trucks
  • Home
  • News
  • Materials Handling
  • Health & Safety
  • Notice Board
  • Multimedia
    • Audio
    • Book Review
    • T.V.
    • Video
  • Contact Us
  • About Us
  • follow
    • Facebook
    • Twitter
    • Google+
    • Pinterest
    • RSS Feed
    • Linked
    • Youtube

Fire safety cannot be left until the end of construction

Jul 17, 2026 Warehousing Ireland News, Safety, Storage, Warehousing Comments Off on Fire safety cannot be left until the end of construction


Morag Evans, CEO of Databuild

In construction, fire safety can look like something that belongs near the end of a project, when plans are checked, inspections take place, and handover documents are prepared. In reality, the important decisions are made much earlier. A specified product may be changed because of cost or availability, a service route may shift on-site, or a fire-rated element may be adjusted to solve an immediate practical problem.

These decisions are usually made under pressure and often for understandable reasons. But if the fire safety implications are not properly considered, documented, and approved, they can slowly weaken the very systems the building depends on when something goes wrong.

The National Building Regulations and Building Standards Act provides the legal basis for building standards, while Part T of the National Building Regulations deals with fire protection. SANS 10400-T provides deemed-to-satisfy requirements for compliance with Part T, covering areas such as means of escape, fire resistance, compartmentation, detection and alarm systems, fire doors, emergency lighting, and suppression systems.

These frameworks are important, but their existence does not make buildings safe on its own. We have been reminded of this too often. The Usindiso building fire in Johannesburg showed what can happen when fire safety features are not maintained, protected, or respected. The Commission of Inquiry found that firefighting connections had been removed or tampered with, exit doors had been welded shut, evacuation routes had been blocked or converted into living spaces, and the building did not comply with fire safety requirements. Seventy-six people died.

The 2022 Parliament fire also showed that fire safety depends on working systems, not just installed systems. Reports after the fire raised concerns around sprinklers, detection, alarms, and evacuation arrangements. It was a reminder that a building can have fire protection infrastructure on paper and still fail if maintenance, monitoring, and accountability break down.

Construction considerations

Construction adds another layer of risk. During a build, the asset is incomplete. Permanent systems may not yet be operational. Temporary electrical installations, hot works, stored materials, fuel, solvents, packaging, dust, and restricted access can all change a site’s fire profile. The Construction Regulations, 2014, issued under the Occupational Health and Safety Act, form part of the legal health and safety framework for construction work, and they reinforce the need for proper planning, supervision, documentation, and risk management during the construction phase.

This is why fire safety has to be understood as a project discipline. The risk is rarely created by one decision. It is created when design intent does not carry through into procurement, when a specified product is substituted without understanding its fire performance, when penetrations through fire-rated walls are not properly sealed, when fire doors are fitted but held open, when escape routes become storage areas, or when documentation is too weak to prove what was installed and tested.

Each decision may look small at the time. Together, they determine whether the building performs as intended when it matters.

Market pressures

This is especially important in a pressured market. Contractors, developers, suppliers, and professional teams are dealing with cost escalation, tight margins, long lead times, and delivery pressure. Those conditions can make substitutions and shortcuts more tempting. A cheaper product, a faster installation, or a small deviation from specification may seem manageable. In fire safety, the margin for error is very thin.

The George building collapse was not a fire incident, but it offers a broader construction lesson that applies here. Government statements on the NHBRC investigation pointed to serious failures across registration, enrolment, inspection, supervision, material quality, technical capability, municipal approval processes, and adherence to health and safety obligations. It showed how construction risk accumulates when oversight weakens across the value chain. Fire safety is no different. It requires continuity from concept to occupation.

Understanding the environment

At Databuild, we see every day how many parties shape the outcome of a construction project before a building is complete. Architects, engineers, quantity surveyors, contractors, subcontractors, suppliers, manufacturers, developers, and public authorities all influence what eventually gets built. The industry needs better discipline around specifications, project information, accountability, and documentation, because fire safety is affected by decisions made long before anyone walks through a building with a checklist.

A compliant design is only the start. It has to carry through into the materials procured, the way those materials are installed, the inspections that verify what was actually done, and the handover records that enable the building to be maintained properly after occupation. From there, responsibility shifts to operations, where fire systems must remain operational, escape routes must stay usable, and the building must continue to reflect the safety assumptions on which it was approved.

Fire safety should not be treated as the concern of one professional at the end of a project. It belongs to every party that designs, specifies, prices, procures, builds, inspects, approves, occupies, and maintains the asset. The regulations provide the baseline. The project team determines whether that baseline survives contact with reality.

Tweet

  • tweet
Rhenus to Further Strengthen Warehousing Solutions in the Philippines Decathlon Reaches 700 Stores Equipped with Vusion Solutions

Warehousing Ireland

Related articles
  • Ireland’s warehouses are running out of floor, not height
    Ireland’s warehouses are running...

    Nov 06, 2026 Comments Off on Ireland’s warehouses are running out of floor, not height

  • DHL Group continues its growth trajectory in the third quarter and significantly increases revenue and earnings
    DHL Group continues its growth...

    Nov 06, 2026 Comments Off on DHL Group continues its growth trajectory in the third quarter and significantly increases revenue and earnings

  • Elevate Storage Solutions wins major S&W Wholesale contract as it continues all-Ireland growth
    Elevate Storage Solutions wins major...

    Nov 06, 2026 Comments Off on Elevate Storage Solutions wins major S&W Wholesale contract as it continues all-Ireland growth

More in this category
  • Ireland’s warehouses are running out of floor, not height
    Ireland’s warehouses are running...

    Nov 06, 2026 Comments Off on Ireland’s warehouses are running out of floor, not height

  • DHL Group continues its growth trajectory in the third quarter and significantly increases revenue and earnings
    DHL Group continues its growth...

    Nov 06, 2026 Comments Off on DHL Group continues its growth trajectory in the third quarter and significantly increases revenue and earnings

  • Elevate Storage Solutions wins major S&W Wholesale contract as it continues all-Ireland growth
    Elevate Storage Solutions wins major...

    Nov 06, 2026 Comments Off on Elevate Storage Solutions wins major S&W Wholesale contract as it continues all-Ireland growth


Tweets by @warehousingIrl

Recent Posts

Business continuity drives new cybersecurity demands in distribution

Business continuity drives new cybersecurity demands in distribution

Jul 25, 2026 Comments Off on Business continuity drives new cybersecurity demands in distribution

As distribution centres become increasingly software-driven, warehouse operators want to understand how automation suppliers can support business continuity and recovery planning....
Decathlon Reaches 700 Stores Equipped with Vusion Solutions

Decathlon Reaches 700 Stores Equipped with Vusion...

Jul 17, 2026 Comments Off on Decathlon Reaches 700 Stores Equipped with Vusion Solutions

LEEA logo – looking after the badge of excellence

LEEA logo – looking after the badge of...

Jul 04, 2026 Comments Off on LEEA logo – looking after the badge of excellence

Supporting safer forklift operations in container loading through automation

Supporting safer forklift operations in container...

May 08, 2026 Comments Off on Supporting safer forklift operations in container loading through automation

LogiMAT 2026: Crown Welcomes Trade Visitors with Its Exhibition Stand

LogiMAT 2026: Crown Welcomes Trade Visitors with...

Apr 03, 2026 Comments Off on LogiMAT 2026: Crown Welcomes Trade Visitors with Its Exhibition Stand

Recent Posts

Saving lives and businesses since 1877  – Business Sprinkler Alliance

Saving lives and businesses since 1877 – Business Sprinkler

Apr 19, 2026 Comments Off on Saving lives and businesses since 1877 – Business Sprinkler Alliance

In February 1877, a fire broke out in a Massachusetts mill. It was, by most accounts, an unremarkable fire and the kind of incident that at any other time would have gutted a building,...
New ESG team will drive Toyota’s sustainability plans

New ESG team will drive Toyota’s sustainability...

May 10, 2024 Comments Off on New ESG team will drive Toyota’s sustainability plans

Beaverswood has hazards and restricted area marking safely taped

Beaverswood has hazards and restricted area...

Nov 05, 2022 Comments Off on Beaverswood has hazards and restricted area marking safely taped

RHA launches tail lift safety guidance

RHA launches tail lift safety guidance

May 15, 2021 Comments Off on RHA launches tail lift safety guidance

Axial Properties Ltd fined €80,000 following serious incident in Clonee warehouse

Axial Properties Ltd fined €80,000 following...

Nov 22, 2020 Comments Off on Axial Properties Ltd fined €80,000 following serious incident in Clonee warehouse

Newsletter

Recent Posts

  • Ireland’s warehouses are running out of floor, not height
  • DHL Group continues its growth trajectory in the third quarter and significantly increases revenue and earnings
  • Elevate Storage Solutions wins major S&W Wholesale contract as it continues all-Ireland growth
  • KNAPP UK announces leadership transition
  • Jungheinrich launches sales of the new generation of EFG 5 electric counterbalance forklift trucks
  • From Temporary Warehouse Operative to Business Management Executive: The Unexpected Career Journey of Karolina Skaskiewicz.
  • How to survive packaging’s peak season
  • Finding the ‘right-size’ packaging solution for your business just got easier
  • Garbe Industrial leases logistics property in the Netherlands to a publicly listed international company
  • The knock-on effects of an accident in the materials handling industry
  • Jungheinrich and Automha enter strategic partnership for the gradual automation of existing warehouses
  • Garbe Industrial hands over logistics centre in Salzgitter (Germany) to Takko Fashion
  • TIMCON figures show ongoing pallet repair trend
  • The numbers don’t lie: why industrial fire statistics demand a response
  • EDEKA expands logistics automation at meat-processing facility with AI-powered robots from KNAPP
Copyright 2020 Warehousing Ireland / All rights reserved